Written by 4SYSTEMPublished on Updated on
Digital project management · 7 min reading
The maintenance of a site must make it possible to keep it in working order and to restore it if an intervention or incident disrupts it. Prepare restorable backups, an update procedure, and controls on important tasks. Also assign responsibilities: knowing that an operation is necessary is not enough if no one is responsible for carrying it out or checking the result.
Key points
- A backup must be complete and protected, and its restoration must have been tested.
- Frequency depends on changes and acceptable data loss.
- An update must be followed by functional checks.
- Backtracking and processing recent data is prepared before the intervention.
Define what must be maintained and by whom
Start with the inventory: hosting, CMS, theme, extensions, connected applications and specific developments. For each item, identify who is responsible for maintenance and who to contact in the event of a problem. In a hosted offer, ask which operations are provided by the operator and which still concern your company or its service providers.
Separate maintenance, correction of anomalies and addition of functions. Specify the operations included, the conditions of intervention, the exclusions and the person authorized to decide on an interruption. Keep this information in a document accessible to the team, with a substitute if the usual contact is absent.
Prepare truly restorable backups
Check what each backup contains
For a classic WordPress installation, the official backup documentation distinguishes between files and database: both are necessary for a complete restore. Copying only the images or only the base therefore leaves an incomplete perimeter. For another system, check its documentation and the service purchased.
Request the list of backed up items, their location, and how to restore them. Also check who has the necessary access. A backup announced in an offer does not indicate, in itself, who will be able to recover it or how the site will be put back into service.
Adapt the frequency to the activity
Define how much data loss the business could accept and how much downtime it could withstand. A minimally modified catalog and a store that receives orders do not have the same constraints. Use these answers to discuss frequency, versions kept, and means of recovery, rather than adopting a standard schedule without justification.
Cybermalveillance.gouv.fr recommends scheduling backups as needed, protecting them, and testing how well they work. The site also advises keeping a copy in a different location and taking disconnectable media offline after use. Check how your solution addresses these risks.
Test recovery without touching the active site
Request a restore in a separate, limited-access environment without actual messaging, actual payment, or active business synchronization. Protect personal data in this copy and use test data when testing does not require the actual data. Check for useful content, media, and settings, then replay high-priority tasks. Record the result, difficulties and missing prerequisites. A successfully created archive does not replace this test.
Organize updates and checks
Cybermalveillance.gouv.fr recommends applying the patches without delay, but also test updates when possible and back up before operation. Preparing for an intervention should therefore not become a pretext for leaving a security patch on hold indefinitely.
For a sensitive change, check the publisher information, prepare a backup, and test on a representative copy when you have this environment. Choose a time period suitable for the activity and confirm the person who will monitor the result. If you enable automatic updates, also plan for associated controls and alerts.
Control useful functions, not just reception
After the intervention, verify a form until the message is received according to an authorized scenario, with a test address and a notified recipient. Also check a connection with the right role and important pages on mobile. For a store, control an order process using a suitable test procedure, delivery methods and exchanges with connected tools. Note the expected result, the observed result and the anomalies: “the site is displayed” remains an insufficient control.
Illustrative example: a delivery that has become unavailable
This example is fictitious. A store plans to update an extension related to delivery. Before the intervention, its service provider checks the backup and tests the change on a copy. The scenario reveals that an expected delivery method no longer appears for an eligible address.
The team suspends the deployment, describes the anomaly and seeks a correction. The check concerns the service provided, not just the absence of error messages. If the problem had been discovered after intervention on the active site, the manager would have had to choose between correction and rollback taking into account the orders received in the meantime.
Prepare rollback and alerts
Before any restoration, specify the data that will be replaced and those that have changed since the backup. For a store, plan to reconcile recent orders and payments with the relevant tools. Do not initiate a global restore as if activity had stopped at the time of the copy.
Also define useful alerts: failed backup, site unavailable or anomaly reported on a critical route. Each alert must have a recipient, an alternate, and an expected action. Otherwise, monitoring just accumulates notifications.
Operational checklist
- Inventory the components and their responsible parties.
- Check the perimeter and protection of backups.
- Test a separate restore and log the result.
- Adapt the frequency to changing data.
- Prepare controls before an update.
- Check the routes after the intervention.
- Predict rollback and recent data.
- Assign alerts and keep an intervention log.
Limitations and common errors
This organization does not guarantee the absence of incidents. Avoid confusing backup and protection against all attacks, or successful update and validated operation. If you suspect a compromise, have the problem diagnosed before considering a restoration sufficient. The contract should match your actual environment, not a generic list of operations.
Frequently asked questions
Are the host’s backups enough?
Check their content, available versions, access and recovery procedure. Request a test restoration and identify limitations before relying on them.
Should everything be updated on a fixed schedule?
A schedule makes it easier to track, but should not delay an urgent fix. Distinguish between planned interventions and security alert processing.
What to ask for in the maintenance report?
The operations carried out, the components concerned, the checks carried out, the remaining anomalies and the expected actions. A simple mention of “maintenance done” does not allow the perimeter to be verified.
Next step: Request proof of restoration
Identify the person responsible for the backups and request the result of the last recovery test, or arrange for this test. If the division of responsibilities remains unclear, gather your inventory and questions before contact 4SYSTEM.
Sources and resources
- WordPress: save files and database.
- Cybermalveillance.gouv.fr: manage and test your backups.
- Cybermalveillance.gouv.fr: manage your updates.
A FIRST EXCHANGE
A project to develop?
Tell us about your site, campaigns or emails. We will define with you the next actions to take.